Case Study
Dentons
Upon their decision to relocate to the Royal Trust Tower at 77 King St W, Dentons desired to build a LEED Gold Certified facility to house their operations. Retained as Construction Manager, MARANT was heavily involved in the pre-construction phase providing budget estimates, value engineering solutions, long-lead planning, scheduling, and LEED strategy planning.
This project included: the creation of an interconnecting staircase with a custom glass balustrade and floating wood steps, a fully equipped conference facility with acoustic ceilings, a new security system, and private offices with unique fronts and millwork.