Case Study Gowling WLG LLP

See All Projects

From day one, I had confidence that the MARANT experience was going to be successful and I was not disappointed. They always went above and beyond, and were instrumental in assisting us navigate a challenging project. My deep thanks for everything MARANT did to ensure our vision was brought to reality.

Heather Caldwell, CPA General Manager, Gowling WLG LLP

It was critical to the firm that their business stayed live throughout the seven-phased construction process of the Gowling offices. In order to accommodate, swing space was obtained in two buildings, across 3 floors.

The design and pre-construction phase was generous and allowed the core team appropriate time to collaboratively design, budget, and value engineer to maximize creative impact, while adhering to the client’s financial objectives.

Once vacated, the floors were demolished and newly constructed as per the new design concept for the firm. The area surrounding the staircase was hoarded off and remained secured until the end of construction, while construction of the conference floor began with the first practice floor. The seventh phase of the construction process connected all floors for the final result.

Top